Work List Views
Phase Views & Favorites
- 1 Phase Views & Favorites
- 1.1 ⬜ Intro
- 1.2 🟩 1 - All Phases
- 1.2.1 🔵 Work Order & Phase Numbers
- 1.2.2 🔵 Creation & Assign Dates
- 1.2.3 🔵 Phase Contact
- 1.2.4 🔵 Priority Level
- 1.2.5 🔵 Location & Phase Description
- 1.2.6 🔵 Phase Status & Asset Number
- 1.3 🟩 2 - Scheduled Phases
- 1.4 🟩 3 - PM Phases
- 1.4.1 🔵 Priority
- 1.4.2 🔵 Wrench Icon
- 1.4.2.1 ⚫ Wrench without Green Dot
- 1.4.2.1.1 ⚪ Checkpoints
- 1.4.2.1.2 ⚪ Required Fields
- 1.4.2.2 ⚫ Wrench with Green Dot
- 1.4.2.1 ⚫ Wrench without Green Dot
- 1.4.3 🔵 Asset Information
- 1.4.3.1 ⚫ Asset Details
- 1.4.3.2 ⚫ Asset Attachments
- 1.4.3.3 ⚫ Asset Details
- 1.4.3.4 ⚫ Asset Attachments
- 1.4.4 🔵 Assessment Activity
- 1.4.4.1 ⚫ Notes & WO
- 1.5 🟩 4 - Favorites
- 1.6 ⬜ Conclusion
⬜ Intro
Click on Work List from the AiM Mobile section of your home screen in Anvil.
There are 4 views within the Work List module in Anvil. They can be thought of as buckets used for sorting your work list. Below, we will briefly cover each.
🟩 1 - All Phases
🔵 Work Order & Phase Numbers
🔵 Creation & Assign Dates
🔵 Phase Contact
🔵 Priority Level
🔵 Location & Phase Description
🔵 Phase Status & Asset Number
🟩 2 - Scheduled Phases
🟩 3 - PM Phases
🔵 Priority
🔵 Wrench Icon
⚫ Wrench without Green Dot
⚪ Checkpoints
⚪ Required Fields
⚫ Wrench with Green Dot
🔵 Asset Information
⚫ Asset Details
⚫ Asset Attachments
🔵 Assessment Activity
⚫ Notes & WO
🟩 4 - Favorites
⬜ Conclusion
We just covered the 4 views in the Work List module of Anvil.
The 4 Views in Anvil’s Work List Module | |
---|---|
1 - All Phases | Shows all the phases attached to work orders you are assigned to (including PM phases) |
2 - Scheduled Phases | Phases that are high priority (today’s to-do list) |
3 - PM Phases | Shows all preventive maintenance (PM) phases |
4 - Favorites | A collection of all the phases you starred |
Phases have key information highlights for you to easily browse.
Phase Listing Information Highlights | ||||
---|---|---|---|---|
| 1- All | 2 - Scheduled | 3 - PM | 4 - Favorites |
WO / Phase # | ✅ | ✅ | ✅ | ✅ |
Creation & Assign Dates | ✅ | ✅ | ✅ | ✅ |
Phase Contact | ✅ | ✅ | ✅ | ✅ |
Priority Level (Urgency) | ✅ | ✅ | ✅ | ✅ |
Location | ✅ | ✅ | ✅ | ✅ |
Phase Description | ✅ | ✅ | ✅ | ✅ |
Phase Status | ✅ | ✅ | ✅ | ✅ |
Asset Number / Info Link | If PM | If PM | ✅ | If PM |
Wrench Icon / Checkpoints | If PM | If PM | ✅ | If PM |
We also covered PM phases more in depth, including the following:
Other PM Phase Features | |
---|---|
Wrench Icon | If the wrench icon has the green dot, there are either no required checkpoint fields, or all of them have been filled out. |
Asset Details | Click on the asset number from the work list to view asset details. |
Asset Attachments | Asset details can include attachments, including PDF files and images. |
Assessment Activity | From the Asset details window, you can add assessment activities (Renewal or Replace). |
Notes Log & WO Notes | From the Assessment Activity window, you can add an optional note to the phase, which is saved to the phase Notes Log as well as the phase WO Notes. |