Views
Phase Views & Favorites
- 1 Phase Views & Favorites
- 1.1 ⬜ Intro
- 1.2 🟩 All Phases View
- 1.2.1 🔵 Work Order & Phase Numbers
- 1.2.2 🔵 Creation & Assign Dates
- 1.2.3 🔵 Phase Contact
- 1.2.4 🔵 Priority Level
- 1.2.5 🔵 Location & Phase Description
- 1.2.6 🔵 Phase Status & Asset Number
- 1.3 🟩 Scheduled Phases View
- 1.4 🟩 PM Phases View
- 1.4.1 🔵 Priority
- 1.4.2 🔵 Wrench Icon - Checkpoints
- 1.4.2.1 ⚫ Wrench without Green Dot
- 1.4.2.1.1 ⚪ Checkpoints / PM Measures
- 1.4.2.1.2 ⚪ Required Fields
- 1.4.2.2 ⚫ Wrench with Green Dot
- 1.4.2.1 ⚫ Wrench without Green Dot
- 1.4.3 🔵 Asset Information
- 1.4.3.1 ⚫ Asset Details
- 1.4.3.2 ⚫ Asset Attachments
- 1.4.3.3 ⚫ Assessment Activity
- 1.4.3.4 ⚫ Notes & WO
- 1.5 🟩 Favorites View
- 1.6 ⬜ Conclusion
⬜ Intro
There are 4 main views within the Work List module in Anvil, which we will cover in this tutorial. These views can be seen as separate buckets used for sorting phases in different ways for your convenience.
The Work List module is accessed from the AiM Mobile section of the left menu of your home screen in Anvil. Click on the Work List icon to follow along with this tutorial.
🟩 All Phases View
🟩 Scheduled Phases View
🟩 PM Phases View
🟩 Favorites View
⬜ Conclusion
Now you understand there are 4 views in the Work List module of Anvil.
The 4 Views in Anvil’s Work List Module | |
---|---|
All Phases | Shows all the phases you are assigned to (including PM phases) |
Scheduled Phases | Phases that are due today (today’s to-do list) |
PM Phases | Shows all preventive maintenance (PM) phases you’re assigned to |
Favorites | A collection of all the phases you starred |
Phase listings have key information highlights for you to easily browse.
Phase Listing Information Highlights | ||||
---|---|---|---|---|
| All | Scheduled | PM | Favorites |
WO / Phase # | ✅ | ✅ | ✅ | ✅ |
Creation & Assign Dates | ✅ | ✅ | ✅ | ✅ |
Phase Contact | ✅ | ✅ | ✅ | ✅ |
Priority Level (Urgency) | ✅ | ✅ | ✅ | ✅ |
Location | ✅ | ✅ | ✅ | ✅ |
Phase Description | ✅ | ✅ | ✅ | ✅ |
Phase Status | ✅ | ✅ | ✅ | ✅ |
Asset Number / Info Link | If PM | If PM | ✅ | If PM |
Wrench Icon / Checkpoints | If PM | If PM | ✅ | If PM |
We also covered PM phases more in depth, including the following:
Other PM Phase Features | |
---|---|
Wrench Icon | If the wrench icon has the green dot next to it, there are either no required checkpoint fields, or all of them have been filled out. |
Asset Details | Click on the asset number from the phase listing to view asset details. |
Asset Attachments | Asset details can include attachments, including PDF files and images. |
Assessment Activity | From the Asset details window, you can add assessment activities (Renewal or Replace). |
Notes Log & WO Notes | From the Assessment Activity window, you can add an optional note to the phase, which is saved to the phase Notes Log as well as the phase WO Notes. |
This concludes the Anvil Work List module Views tutorial.